Client: Suffolk
Project Details:
This design-build project consists of the demolition of the existing Terminal H facility at PortMiami and the new construction of a state-of-the-art, three-story terminal for Virgin Voyages.
Construction also includes coral relocation projects, waterside improvements for vessel services, the dredging of the existing waterway, a wharf extension, new bulkhead, installation of mooring/storm bollards and mooring dolphins, and stormwater drainage.
Client: TY Lin
Project Details:
The projects include the replacement of approximately 9,000 linear feet of steel sheet pile bulkheads of various configurations and condition most of which were constructed in the 1950’s and 1960’s. Upland improvements to aprons will be consistent to that required for bulkhead replacement waterward of the existing bulkheads. Services shall include deep-water marine structural engineering, corrosion protection, berthing and mooring analysis, civil and utility engineering, geotechnical investigations and foundation engineering, scour analysis and scour protection, bathymetric and topographic surveying, coral and benthic habitat surveys, regulatory agency permitting, construction cost estimating and project scheduling, as well as contract administration, construction engineering and construction inspection. CBE goal:25
Primavera P6 is a leader in web-based construction management software. We employ the Primavera P6 platform to ensure timely, on-budget completion.